Safelik Convert by Netralid
Done
A.4.1.1.25a - Pemasangan 1 M2 bekisting untuk dinding
A.4.1.1.25a - Pemasangan 1 M2 bekisting untuk dinding |
NO |
URAIAN |
SATUAN |
KOEFISIEN |
HARGA SATUAN |
JUMLAH HARGA |
A |
TENAGA |
|
|
|
|
|
Pekerja |
OH |
0,6600 |
81.500,00 |
53.790,00 |
|
Tukang Kayu |
OH |
0,3300 |
96.500,00 |
31.845,00 |
|
Kepala Tukang |
OH |
0,0330 |
107.000,00 |
3.531,00 |
|
Mandor |
OH |
0,0330 |
107.000,00 |
3.531,00 |
|
|
|
JUMLAH HARGA TENAGA |
92.697,00 |
B |
BAHAN |
|
|
|
|
|
Kayu kelas III |
M' |
0,0300 |
3.500.000,00 |
105.000,00 |
|
Paku 5 cm – 12 cm |
Kg |
0,4000 |
23.000,00 |
9.200,00 |
|
Minyak bekisting |
Liter |
0,2000 |
5.150,00 |
1.030,00 |
|
Balok kayu kelas II |
M' |
0,0200 |
4.500.000,00 |
90.000,00 |
|
Plywood tebal 9 mm |
Lbr |
0,3500 |
125.000,00 |
43.750,00 |
|
Dolken Bambu |
Batang |
3,0000 |
25.000,00 |
75.000,00 |
|
Penjaga jarak bekisting/ spacer |
Buah |
4,0000 |
6.000,00 |
24.000,00 |
|
|
|
JUMLAH HARGA BAHAN |
347.980,00 |
C |
ALAT |
|
|
|
|
|
- |
- |
- |
- |
- |
|
|
|
JUMLAH HARGA ALAT |
- |
D |
Jumlah |
(A+B+C) |
|
|
440.677,00 |
E |
Overhead & Profit |
10% x D |
|
|
44.067,70 |
F |
HARGA SATUAN PEKERJAAN |
( D + E ) |
|
|
484.744,70 |
======= ARTIKEL TERKAIT =======
Post a Comment for "A.4.1.1.25a - Pemasangan 1 M2 bekisting untuk dinding"