Skip to content Skip to sidebar Skip to footer

Analisa Harga Satuan Pekerjaan Keramik Lantai Dan Dinding

No
URAIAN
SATUAN
KOEF.
HARGA SATUAN (Rp)
SUB. JUMLAH (Rp)
JUMLAH
(Rp)

PEKERJAAN KERAMIK LANTAI DAN DINDING


1.

1 m²  Pasang Lantai Keramik Ukuran (30 x 30) cm---Polished setara Roman

Bahan :
-  Keramik uk. 30x30cm polished
-  PC
-  PP
-  Semen Warna

Tenaga Kerja :
-  Pekerja
-  Tukang Batu
-  Kepala Tukang
-  Mandor








 M2

kg
kg


org/hr
org/hr
org/hr
org/hr







1.05

10
0.045  1.500


0.700
0.350
0.035
0.035







1,100,00

1,000
265,000
18,870.00


157,643
166,729
182,676
194,274







115,500

10,000
11,925
28,305


110,350.10  58,355.15
6,393.66  6,799.59


Jumlah Harga :
347,628.50

Keuntungan 10% :


Jumlah Harga :
347,628.50


2.

1 m²  Pasang Lantai Keramik Ukuran (30 x 30) cm---Unpolished setara Roman

Bahan :
-  Keramik uk. 30x30cm Unpolished/Anti slip
-  PC
-  PP
-  Semen Warna


Tenaga Kerja :
-  Pekerja
-  Tukang Batu
-  Kepala Tukang
-  Mandor








 M2


kg
kg



org/hr
org/hr
org/hr
org/hr







1.05


10
0.045  1.500



0.700
0.350
0.035
0.035







119,000


1,000
265,000
18,870.00



157,643
166,729
182,676
194,274







124,950


10,000
11,925
28,305



110,350.10 58,355.15
6,393.66  6,799.59


Jumlah Harga :
357,078.50

Keuntungan 10% :


Jumlah Harga :
357,078.50


3.

1 m²  Pasang Lantai Keramik Ukuran (20 x 20) cm --- Polished/Glazed setara Roman Gol. B

Bahan :
-  Keramik uk. 20x20cm Polished/Glazed
-  PC
-  PP
-  Semen Warna


Tenaga Kerja :
-  Pekerja
-  Tukang Batu
-  Kepala Tukang
-  Mandor








 M2



kg
kg



org/hr
org/hr
org/hr
org/hr







1.05



10.400 0.045   1.620



0.700
0.350
0.035
0.035







122,600



1,000
265,000
18,870.00



157,643
166,729
182,676
194,274







128,730



10,400
11,925
30,569.40



110,350.10 58,355.15
6,393.66  6,799.59


Jumlah Harga :
363,522.90

Keuntungan 10% :


Jumlah Harga :
363,522.90


4.

1 m²  Pasang Lantai Keramik Ukuran (20 x 20) cm --- Unpolished/Anti slip setara Roman Gol. B

Bahan :
-  Keramik uk. 20x20cm Polished/Glazed
-  PC
-  PP
-  Semen Warna

Tenaga Kerja :
-  Pekerja
-  Tukang Batu
-  Kepala Tukang
-  Mandor








 M2



kg
kg


org/hr
org/hr
org/hr
org/hr







1.05



10.400 0.045   1.620


0.700
0.350
0.035
0.035







122,000



1,000
265,000
18,870.00


157,643
166,729
182,676
194,274







128,100



10,400
11,925
30,569.40


110,350.10 58,355.15
6,393.66  6,799.59


Jumlah Harga :
362,892.90

Keuntungan 10% :


Jumlah Harga :
362,892.90


5.

1 m²  Pasang Lantai keramaik Ukuran (40 x 40) cm---Polished setara Roman Gol. B

Bahan :
-  Keramik uk. 40x40cm polished/Glazed
-  PC
-  PP
-  Semen Warna

Tenaga Kerja :
-  Pekerja
-  Tukang Batu
-  Kepala Tukang
-  Mandor








 M2


kg
kg


org/hr
org/hr
org/hr
org/hr







1.061


12.250 0.045    1.300


0.700
0.350
0.035
0.035







105,000


1,000
265,000
18,870.00


157,643
166,729
182,676
194,274







111,384


12,250
11,925
24,531


110,350.10 58,355.15
6,393.66  6,799.59


Jumlah Harga :
341,988.50

Keuntungan 10% :


Jumlah Harga :
341,988.50


6.

1 m²  Pasang Lantai keramik Ukuran (60 x 60) cm---Polished setara Roman

Bahan :
-  Keramik uk. 60x60cm polished/Glazed
-  PC
-  PP
-  Semen Warna


Tenaga Kerja :
-  Pekerja
-  Tukang Batu
-  Kepala Tukang
-  Mandor








 M2


kg
kg



org/hr
org/hr
org/hr
org/hr







1.080


9.600 0.045    1.500



0.240  0.120
0.012  0.012







186,000


1,000
265,000
18,870.00



157,643
166,729
182,676
194,274







200,880


9,600
11,925
28,305



37,834.32  20,007.48
2,192.11  2,331.29


Jumlah Harga :
313,075.20

Keuntungan 10% :


Jumlah Harga :
313,075.20


7.

1 m²  Pasang Lantai keramik Ukuran (60 x 60) cm---Unpolished setara Roman

Bahan :
-  Keramik uk. 60x60cm polished/Glazed
-  PC
-  PP
-  Semen Warna


Tenaga Kerja :
-  Pekerja
-  Tukang Batu
-  Kepala Tukang
-  Mandor








 M2


kg
kg



org/hr
org/hr
org/hr
org/hr







1.080


8.140 0.045    1.620



0.240  0.120
0.012  0.012







186,000


1,000
265,000
18,870.00



157,643
166,729
182,676
194,274







200,880


8,140
11,925
30,569.40



37,834.32  20,007.48
2,192.11  2,331.29


Jumlah Harga :
326,796.40

Keuntungan 10% :


Jumlah Harga :
326,796.40


8.

1 m²  Pasang Dinding Keramik Ukuran (20 x 20) cm---Polished setara Roman Gol. B

Bahan :
-  Keramik Ukuran (20 x 20) cm Roman
-  PC
-  PP
-  Semen Warna




Tenaga Kerja :
-  Pekerja
-  Tukang Batu
-  Kepala Tukang
-  Mandor








 M2

kg
kg





org/hr
org/hr
org/hr
org/hr







1.050

9.300  0.018  1.940





0.900  0.450
0.450  0.450







122,600

1,000
265,000
18,870.00





157,643
166,729
182,676
194,274







128,730

9,300
4,770
36,607.80





141,878.70  75,028.05
8,220.42  8,742.33


Jumlah Harga :
413,277.30

Keuntungan 10% :


Jumlah Harga :
413,277.30


9.

1 m²  Pasang Dinding Keramik Ukuran (20 x 25) cm ---Polished setara Roman Gol. B

Bahan :
-  Keramik Ukuran (20 x 25) cm Roman
-  PC
-  PP
-  Semen Warna




Tenaga Kerja :
-  Pekerja
-  Tukang Batu
-  Kepala Tukang
-  Mandor








 M2

kg
kg





org/hr
org/hr
org/hr
org/hr







1.050

9.300   0.045 1.940





0.900  0.450
0.450  0.450







115,400

1,000
265,000
18,870.00





157,643
166,729
182,676
194,274







121,170

9,300
11,925 36,607.80





141,878.70  75,028.05
8,220.42  8,742.33


Jumlah Harga :
412,872.30

Keuntungan 10% :


Jumlah Harga :
412,872.30


10.

1 m²  Pasang Dinding Keramik Ukuran (20 x 40) cm---Polished setara Roman Gol. B

Bahan :
-  Keramik Ukuran (20 x 40) cm, Roman
-  PC
-  PP
-  Semen Warna

Tenaga Kerja :
-  Pekerja
-  Tukang Batu
-  Kepala Tukang
-  Mandor








 M2

kg
kg


org/hr
org/hr
org/hr
org/hr







1.050

9.300   0.045
1.552


0.900  0.450
0.450  0.450







104,000

1,000
265,000
18,870.00


157,643
166,729
182,676
194,274







109,200

9,300
11,925
29,286.24


141,878.70  75,028.05
8,220.42  8,742.33


Jumlah Harga :
393,580.74

Keuntungan 10% :


Jumlah Harga :
393,580.74


11.

1 m²  Pasang Dinding Keramik Ukuran (30 x 30 ) cm ---Polished setara Roman

Bahan :
-  Keramik Ukuran (30 x 30) cm
-  PC
-  PP
-  Semen Warna

Tenaga Kerja :
-  Pekerja
-  Tukang Batu
-  Kepala Tukang
-  Mandor








 M2

kg
kg


org/hr
org/hr
org/hr
org/hr







1.050

9.300   0.045
1.552


0.900  0.450
0.450  0.450







95,000

1,000
265,000
18,870.00


157,643
166,729
182,676
194,274







99,750

9,300
11,925
29,286.24


141,878.70  75,028.05
8,220.42  8,742.33


Jumlah Harga :
384,130.74

Keuntungan 10% :


Jumlah Harga :
384,130.74


12.

1 m²  Pekerjaan Pemasangan Keramik Dinding Ukuran.30x60 cm/Roman/Polised

Bahan :
-  Keramik uk. 30x60cm
-  PC
-  PP
-  Semen Warna

Tenaga Kerja :
-  Pekerja
-  Tukang Batu
-  Kepala Tukang
-  Mandor









 M2

kg
kg


org/hr
org/hr
org/hr
org/hr








1.060

9.600  0.018
0.970


0.900  0.450
0.450  0.450








160,000 

1,000
265,000
18,870.00


157,643
166,729
182,676
194,274








169,600 

9,600
4,770
18,303.90


141,878.70  75,028.05
8,220.42  8,742.33


Jumlah Harga :
436,143.40

Keuntungan 10% :


Jumlah Harga :
436,143.40

Post a Comment for "Analisa Harga Satuan Pekerjaan Keramik Lantai Dan Dinding"