Safelik Convert by Netralid
Done
A.4.7.1.11 - Pengecatan 1 M2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
A.4.7.1.11 - Pengecatan 1 M2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) |
NO |
URAIAN |
SATUAN |
KOEFISIEN |
HARGA SATUAN |
JUMLAH HARGA |
A |
TENAGA |
|
|
|
|
|
Pekerja |
OH |
0,0280 |
81.500,00 |
2.282,00 |
|
Tukang cat |
OH |
0,0420 |
96.500,00 |
4.053,00 |
|
Kepala tukang |
OH |
0,0042 |
107.000,00 |
449,40 |
|
Mandor |
OH |
0,0030 |
107.000,00 |
321,00 |
|
|
|
JUMLAH HARGA TENAGA |
7.105,40 |
B |
BAHAN |
|
|
|
|
|
Cat dasar |
Kg |
0,1200 |
24.000,00 |
2.880,00 |
|
Cat penutup |
Kg |
0,1800 |
24.000,00 |
4.320,00 |
|
|
|
JUMLAH HARGA BAHAN |
7.200,00 |
C |
ALAT |
|
|
|
|
|
- |
- |
- |
- |
- |
|
|
|
JUMLAH HARGA ALAT |
- |
D |
Jumlah |
(A+B+C) |
|
|
14.305,40 |
E |
Overhead & Profit |
10% x D |
|
|
1.430,54 |
F |
HARGA SATUAN PEKERJAAN |
( D + E ) |
|
|
15.735,94 |
======= ARTIKEL TERKAIT =======
Post a Comment for "A.4.7.1.11 - Pengecatan 1 M2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)"