A.5.1.1.24 - Pemasangan 1 M' pipa galvanis diameter 4”
A.5.1.1.24 - Pemasangan 1 M' pipa galvanis diameter 4” |
NO |
URAIAN |
SATUAN |
KOEFISIEN |
HARGA SATUAN |
JUMLAH HARGA |
A |
TENAGA |
|
|
|
|
|
Pekerja |
OH |
0,1350 |
81.500,00 |
11.002,50 |
|
Tukang batu |
OH |
0,2250 |
96.500,00 |
21.712,50 |
|
Kepala tukang |
OH |
0,0230 |
107.000,00 |
2.461,00 |
|
Mandor |
OH |
0,0070 |
107.000,00 |
749,00 |
|
|
|
JUMLAH HARGA TENAGA |
35.925,00 |
B |
BAHAN |
|
|
|
|
|
Pipa galvanis 4” |
M |
1,2000 |
225.000,00 |
270.000,00 |
|
Perlengkapan |
% |
35,0000 |
78.750,00 |
78.750,00 |
|
|
|
JUMLAH HARGA BAHAN |
348.750,00 |
C |
ALAT |
|
|
|
|
|
- |
- |
- |
- |
- |
|
|
|
JUMLAH HARGA ALAT |
- |
D |
Jumlah |
(A+B+C) |
|
|
384.675,00 |
E |
Overhead & Profit |
10% x D |
|
|
38.467,50 |
F |
HARGA SATUAN PEKERJAAN |
( D + E ) |
|
|
423.142,50 |